Monitoring and Sceduling of a Bridge Using Primavera: A Review

Open Access Peer Reviewed Crossref DOI

Authors

  • Singh Sagar Amarendra1
  • Hitesh Kodwani2

12Department of Civil Engineering, Sam Global University Bhopal, India.

Article Information

Published Online
May-June 2023
Pages
388-392
Article Type
Research Article
Check for updates
check update

References

1) KeshavPhophalia and RiddhaBasu, [EVALUATION OF MICROSOFT PROJECT AND PRIMAVERA P6 AS CONSTRUCTION
PROJECT MANAGEMENT SOFTWARE IN INDIA], INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING
RESEARCH AND TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 5, ISSUE 3, Mar.-2018.
2) A.A.Lakade, A.K.Gupta and D.B.Desai, [A Project Management Approach Using Erp And Primavera In Construction Industry], IOSR
Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 21-24, 2020.
3) AnuragMahure and Amit kumarRanit, [Construction Project Analysis Using Primavera P6], JASC: Journal of Applied Science and
Computations, Volume 5, Issue 8, August /2018, ISSN NO: 1076-5131.
4) Divya V S and C Gayathri, [Flexible Scheduling in Construction Industry by Using Primavera], International Journal for Modern
Trends in Science and Technology ISSN: 2455-3778, Volume: 06, Issue No: 04, April 2020.
5) YashPandit, Swaroop Kulkarni, YashChoulwar, SoumitraKher and S.D.Marawar, [Analysis of Planning and Scheduling Using
Traditional and Primavera Approach], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 6,
Issue 4, April 2017.
6) T.Subramani and K.Chinnadurai, [Construction Management And Scheduling Of Residential Building Using Primavera],
International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 4, Issue 5, May 2015, ISSN 2319
- 4847.
7) V.S. Divya, [Flexible Scheduling For Construction by Using Primavera Software], ICONIC RESEARCH AND ENGINEERING
JOURNALS, NOV 2019 | IRE Journals | Volume 3 Issue 5 | ISSN: 2456-8880.
8) Md. ZishanMallick and MohdZeeshan khan, [CONSTRUCTION PLANNING AND CONTROL USING PRIMAVERA P6], IJARIIE-
ISSN(O)-2395-4396, Vol-5 Issue-4 2019.
9) BalakrishnaCh, AnandGoud K, Akula Prakash and KandlaguntaMounik, [Schedule delay analysis of a multi-storied residential project
using primavera], IOP Conf. Series: Materials Science and Engineering, ICIRMCT 2021.
10) Sudarshan. S and Geena George, [COMPARISON OF PROJECT PLANNING & SCHEDULING SOFTWARE PRIMAVERA AND
MICROSOFT PROJECT USED IN THE CONSTRUCTION INDUSTRY], International Journal of Engineering Technologies and
Management Research Septmber 2021 8(9), 78-87.
11) Hitanshu Saini, Khushpreet Singh and Uma Malik, [PROJECT MANAGEMENT IN CONSTRUCTION USING PRIMAVERA],
International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 8, August 2017, pp. 538–549, Article ID:
IJCIET_08_08_055.
12) K.Priya, M.Kathiresan, D.Vengateshwari and M.Suriyakumari, [PLANNING, ANALYSIS AND CONSTRUCTION SCHEDULING OF
APPARTMENT BUILDING (G+13) BY USING PRIMAVERA P6], International Journal of Scientific Development and Research
(IJSDR), March 2019 IJSDR | Volume 4, Issue 3, ISSN: 2455-2631.
APC from ₹1200 + 18% GST

Peer-reviewed open access₹1200 Indian (₹1400 with DOI)$80 USD internationalpaid after acceptance Peer-reviewed open access₹1200 Indian$80 USD international ₹1200 Indian · $80 intl

  • CrossRef DOI
  • ISSN 2582-8746
  • Open Access
  • Peer Reviewed
  • Plagiarism Checked
  • Google Scholar
Submit Paper